Home
 

Statement-I

Projects /Schemes Under Implementation/Proposed for Implementation And Provided for in Budget

(Rs. in Crores)

 

DETAIL

TOTAL COST

EXPEN- DITURE UPTO 1997-98 (ACTUAL) ACTUAL EXPEN- DITURE UPTO OCT 98 OUTLAY 98-99 PROPOSED OUTLAY 1999-2000 ESTIMATE START OF COMM PROD. REASON FOR VARIATION BE/RE 1998-99
ORIGINAL COST AS PER IXth PLAN LATEST APPR- OVED NOW ANTIC- IPATED BE RE ORIGINAL NOW ANTI- CIPATED
A CONTINUING SCHEME
1 SODIUM NITRATE NITRITE

3.50

3.50

3.30

2.18

0.13

0.30

0.17

0.00

- -
2 DCS METHYLAMINES

1.50

1.50

1.80

1.34

-

0.54

0.18

0.00

- -
3 TECHNOLOGY   UPGRADATION AND ADVANCE CONTROL METHANOL

-

0.00

1.50

0.0

-

1.20

1.00

0.50

- -
4 AMMONIUM BI- CARBONATE

9.90

9.90

7.50

0.73

2.26

0.00

6.40

0.39

- -
5 AMMONIA STORAGE TANK TR

24.00

24.00

27.50

17.81

4.80

5.50

8.45

0.31

10.8.98

-

6 SEWAGE TREATMENT PLANT

30.00

30.00

38.00

4.36

8.87

12.99

27.00

6.06

30.4.99

30.4.99
7 REVAMPING OF TR (TAIL END)

96.72

96.72

99.82

27.19

15.78

21.24

30.00

41.32

- -
8 PROCESS OPTIMISATION

3.55

3.55

-

2.32

-

10.00

-

-

COMPLETED

-

9 TROMBAY COMPLEX OPTIMISATION

3.00

3.00

-

0.02

-

-

-

-

- -
10 ADV CONTROL IN TROMBAY

1.50

1.50

-

0.01

-

0.00

-

-

COMPLETED

-
11 NOX ABATEMENT NEW NITRIC ACID

2.85

2.85

-

1.85

- - - -

COMPLETED

-
12 SOFTWARE FOR PROCESS - -

0.37

0.00

-

0.07

-

-

-
13 TR V AMMONIA OPTIMISATION PROCESS - -

2.30

-

-

0.37

-

-

-

14 TECHNO UPGRADATION  TR V AMMONIA

13.00

-

12.80

9.96

-

-

0.63

-

31.3.98

-

15 DCS IN NEW NAP

-

-

3.10

0.00

-

1.00

2.50

0.60

- 31.3.2000
16 DCS IN TR V AMMONIA

6.00

-

6.00

0.00

-

3.00

1.20

4.80

- 31.3.2000
17 MODRN OF UREA /ANP BAGG PLANT1

-

-

30

-

-

-

0.50

10.00

-

-

CONTINUING SCHEMES (THAL)
1 CONDENSATE UTILISATION

12

12

12.09

1.42

- -

0.06

10.60

-

-

2 ADDITIONAL   SCHEMES AT THAL
i) RENOVATION AT STATIC EQIUPT.

47.00

47.00

47.00

13.79

26.49

24.35

24.35

5.73

31.10.97

-

ii) RENOV OF ROTATING EQIUPT.

37.00

37.00

47.00

15.00

10.02

26.00

26.00

5.00

31.10.97

APR 99
iii) UPGRADATION OF REFRS.  OF CO2 UNIT

36.00

36.00

36.00

0.01

4.85

28.00

28.00

5.00

31.10.97

APR99
3 FORMIC ACID PLANT AT THAL

47.72

47.72

48.25

30.21

2.72

13.16

13.16

0.00

12.6.97

COMPLTED
4 CO PLAN AT THAL

48.52

48.52

0.00

41.79

4.10

6.72

0.00

0.00

23.5.97

COMPLETED
5 INSTAL OF INERT GAS GEN. UNIT

6.50

6.50

11.54

0.34

8.13

6.50

11.20

0.00

- -
6 PROCESS OPTMISATION (THAL)

4.50

4.50

0.00

0.88

- - - - - -
7 AMMONIA RETROFIT PH 1

49.00

49.00

0.00

25.29

- - - -

-

COMPLETED
8 BOILER CONVERSION  NGL

23.00

17.83

0.00

25.29

- - - -

20.9.95

COMPLETED
9 PRE REFORMER NAPTHA - -

89.95

- - -

10.00

20.00

- -
10 UREA OPTIMISATION PROJECT - -

40.00

- - -

0.00

10.00

- -
TOTAL CONTINUATION SCHEMES

512.26

488.09

573.82

245.12

88.15

161.50

191.73

122.31

- -
B NEW SCHEMES
1 SYN GAS TURBINE/COMPR TR V AMM

50.00

50.00

85.00

6.72

-

1.00

10.00

20.00

- -
2 REVAMPING TR. BAGGING PLANT

0.00

0.00

28.00

0.00

-

1.00

6.00

10.00

- -
3 PHOSPH.   ACID JT. VENTURE TOGO

200.00

200.00

0.00

0.10

-

0.20

0.00

0.00

- -
4 JOINT VENTURE PROJECT AT OMAN

260.00

260.00

474.19

7.98

2.24

70.00

10.00

50.00

- -
5 PHENYL ACETIC ACID PLANT THAL

25.00

25.00

0.00

- -

0.10

-

0.00

- -
6 FEASBLIY STUDIES

2.05

2.05

-

0.66

-

0.25

-

-

- -
7 UREA V UPGADATION

38.00

38.00

55.00

0.0

-

0.50

1.00

1.00

- -
8 DEBOTTLENECKING SCHEMES UREAV

40.00

40.00

0.00

0.00

-

0.50

- - - -
9 ADDITIONAL AMMONIA UREA AT THAL

1205.00

1205.00

1205.00

0.36

0.35

26.6

5.00

100.00

- -
10 REVAMPING OF OLD NAP

50.00

50.00

13.50

-

1.29

6.00

5.00

5.00

- -
11 UPGRADATION OF INSTRUMENTATION OF GHH COMPR. IN NNAP - -

1.80

- -

1.50

1.50

0.30

- -
12 RAIL WAGONS *

68.00

68.00

-

5.50

-

40.80

- - - -
13 METHYLAMINES PROJECT

80.00

- -

0.00

-

0.50

1.00

5.00

- -
14 NITRIC PLANT AT THAL - - -

0.00

-

0.50

- - - -
15 METHANOL PLANT AT THAL - - -

0.00

-

0.50

- - - -
16 OFFICE BUILDING   AT DELHI - -

5.39

1.40

3.37

2.00

3.99

-

- -
17 MODERN. OF BAGGING PLANT AT THAL - -

30.00

0.00

-

-

1.00

5.00

- -
18 INFORMATION   TECHNOLOGY - -

12.72

0.00

- -

1.00

5.00

- -
19 REVAMPING OF THAL UREA

46.45

46.45

-

0.00

-

0.50

- - - -
20 UPGRADATION OF INFRASTRUCTURE FACILITIES AT THAL

48

48

- - -

0.50

- - - -
TOTAL NEW SCHEME

2112.5

2032.50

1910.60

22.72

7.25

152.95

48.48

204.12

- -
C SCIENCE & TECH

15.01

15.01

0.00

- -

1.00

0.00

0.00

- -
D RENEWALS & REPLACEMENTS

375.95

220.73

00.00

203.68

8.02

40

54.70

67.23

- -
TOTAL FOR ORGANISATION (A+B+C+D)

3015.72

2756.33

2484.42

471.52

103.42

355.45

294.91

393.66

- -

* Lease rental arrangement has been done with SBI.

 
HomeFertilizer Policies News FAQ Feedback Photo Gallery Contact Us